Project Overview
This project involved a complete bathroom renovation at a property on Carlton Street, Cheltenham. The scope covered the room from initial decommissioning through to the construction, finishing and electrical stages.
Bathroom and Construction Works
The existing bathroom was decommissioned before the first- and second-fix bathroom works were carried out. The construction scope also included the creation of a new bathroom stud wall framework and the installation of wall and floor tiles.
Flooring and Decoration
The finishing scope included the installation of new flooring and painting.
Electrical Works
The electrical work included a new light switch and bathroom light, a new extractor fan, an LED mirror, and a mirror and wall light. Part P certification was also included within the electrical scope.
Together, the works covered the preparation, construction, tiling, flooring, decoration, lighting, ventilation and electrical requirements of the bathroom renovation.

Bathroom Renovation

Modern, Contemporary

4 Weeks

Cheltenham